Logo

 

climate change50-Megawatt Biomass Incinerator Completed in Woodville

50-Megawatt Biomass Incinerator Completed in Woodville, Texas

- October 28, 2014, HartfordBusiness.com

[[{"type":"media","view_mode":"media_large","fid":"306","attributes":{"alt":"","class":"media-image","height":"264","style":"width: 264px; height: 264px; margin: 3px 10px; float: left;","width":"264"}}]]Glastonbury construction firm Gemma Power Systems has completed the 49.9 megawatt construction of a biomass plant in Woodville, Texas, three months ahead of schedule.

The plant to be run by the East Texas Electric Cooperative will operate on chipped forest waste. Construction of the facility began in 2012.

Financial terms were not disclosed. Gemma served as construction manager.

Gemma's subsidiary Gemma Plant Operations will run the plant for the electric cooperative under a separate contract.