Planned La Pine, OR Biomass Facility Hinges on Market

- by Dylan J. Darling, March 17, 2015, Bend Bulletin

[[{"type":"media","view_mode":"media_large","fid":"423","attributes":{"alt":"","class":"media-image","style":"width: 333px; height: 171px; margin: 3px 10px; float: left;","title":"Photo: Biomass Magazine"}}]]A wood-burning power plant remains a possibility for La Pine, with the city now taking the lead on the project from Deschutes County and the company behind it waiting for a change in the energy market.

“It’s just been on hold due to market conditions,” said Rob Broberg, president of Biogreen Sustainable Energy Co., based in Vancouver, Washington. “And we plan on holding out until we are able to market and sell power.”

The company must find an energy buyer to make the planned plant economically viable, said Rick Allen, La Pine city manager.

“They need to find a power company that wants to buy their power,” he said. “…That’s really the issue.”

The $75 million, 25-megawatt biomass plant would produce enough electricity to power about 19,000 homes, Broberg said. The plant would burn wood — limbs and other scrap left over after logging, debris from thinning projects and urban waste — to heat water, create steam and turn a turbine. Interested power companies would likely be in California, where the state requires an increasing percentage of its power to come from “greener” sources such as biomass, wind and solar.

Landfill Keeps Rhode Island Incinerator Debate Alive

- by Tim Faulkner, March 4, 2015, Eco RI News

[[{"type":"media","view_mode":"media_large","fid":"410","attributes":{"alt":"","class":"media-image","style":"width: 288px; height: 237px; margin: 3px 10px; float: left;"}}]]The seemingly annual debate about building a waste incinerator in Rhode Island resolved little on the issue this year, except that any such facility is too expensive and likely at least 10 years from ever being built.

The sole advocate for considering an incinerator is the operator of the Central Landfill in Johnston, the Rhode Island Resource Recovery Corporation (RIRRC). The agency simply wants to take a hard look at an incinerator as it investigates options for the state’s waste when the landfill inevitably runs out of space.

Currently, state law prohibits RIRRC from owning and operating an incinerator and from even considering it for its comprehensive plan. A pending bill would void the prohibition on studying incineration. It also would remove language in the state law that says incineration is the most expensive method of waste disposal.

“Removing this language is not consent to build,” Sarah Kite, RIRRC’s director of recycling services, said during a Feb. 26 Statehouse hearing. “This is not giving us permission to do anything other than really intensely study this issue and to bring those recommendations back to this board.”

Procter & Gamble Fires Up Massive Biomass Investment

- by Heather Clancy, March 3, 2015, Forbes 

[[{"type":"media","view_mode":"media_large","fid":"409","attributes":{"alt":"","class":"media-image","height":"311","style":"width: 333px; height: 216px; margin: 3px 10px; float: left;","width":"480"}}]]With companies like Apple and Google regularly stealing headlines for their solar and wind investments, it’s easy to forget “renewable” energy comes in many forms.

For consumer products giant Procter & Gamble biomass continues to be highly strategic. Indeed, it’s working on one of the biggest corporate biomass plants in the United States, a 50-megawatt installation at its Bounty and Charmin manufacturing plant in Albany, Georgia.

The $200 million project, spearheaded by Exelon subsidiary Constellation, is actually a replacement for a much smaller boiler that’s been in service for more than 30 years. The new cogeneration technology will provide 100% of the steam needed to run the production line, and approximately 60-70% of the energy for the facility, said Len Sauer, P&G’s vice president of global sustainability. The previous technology contributed about 30% of the total energy needed at the site.

Hardwood Trees Chipped for Nova Scotia Biomass

- by Roger Taylor, February 26, 2015, Herald Business

[[{"type":"media","view_mode":"media_large","fid":"407","attributes":{"alt":"","class":"media-image","style":"width: 444px; height: 251px; margin: 3px 10px; float: left;","title":"Photo: Aaron Beswick/Truro Bureau"}}]]Hardwood trees are being allowed to go up in smoke, and with them a number of rural manufacturing jobs that are hard to replace.

It is easy to reach that conclusion after reading stories about several companies in rural Nova Scotia that have been making products from hardwood.

Just recently, the inability to access enough local hardwood was one of the reasons given by the owners of River’s Bend Wood Products Inc. for shutting down their flooring plant.

The factory in rural Antigonish County once employed 17 workers, but that number has been slowly whittled away. Now the remaining 11 employees will lose their jobs at the mill.

Local Opposition Affects Oregon Biofuel Plant

- by Al Maiorino, March 3, 2015, Environmental Leader

[[{"type":"media","view_mode":"media_large","fid":"295","attributes":{"alt":"","class":"media-image","height":"319","style":"width: 333px; height: 221px; margin: 3px 10px; float: left;","width":"480"}}]]In 2014, the United States Departments of the Navy, Energy and Agriculture awarded a $70 million grant to Red Rock Biofuels for the design, construction, commissioning and performance testing of a new biofuel refinery.  The biorefinery is planned for Lakeview, Oregon, close to the Fremont Nation Forest and the intersecting state lines of Oregon, Nevada, and California. This new renewable project aims to expand military fuel sources, improve reliability of the nation’s fuel supply and prevent supply disruption to reinforce the nation’s energy security.  Despite these benefits that bring additional employment and revenue benefits for the local community of Lakeview, NIMBY, or “not in my backyard,” opponents to biofuel refineries across the United States run fierce opposition campaigns that threaten project completion.  These campaigns can often result in project delays or even cancellation all together, and despite a properly zoned site.

Two Lake County Commissioners, Brad Winters and Ken Kestner, support the biofuel project and believe that when completed, the project will improve Lakeview’s air quality by creating healthier forests and preventing forest fires. Additionally, Oregon Business wrote an economic report stating that the biofuel plant would create up to “25 direct and 79 to 109 indirect and induced jobs,” resulting in an increase in labor income. However, Commissioner Winters acknowledged the myths promoted by the opposition that take hold by noting that those opposed to the creation of the biorefinery are not basing their concerns and objections on factual information.  Winters emphasized the importance of community members’ attendance at review workshops and hearings in order to become more informed as state and federal agencies evaluate the proposal as a prerequisite for completion.

Despite a successful rezone of the proposed site by the Lake County Planning Board, opponents remain focused on keeping the proposal out of their community. They fear that transporting these biofuels through the Lake County railroad from Lakeview to Alturas could possibly result in derailments with damaging effects on the community. The opposition is highly organized, holding meetings to strategize and planning petition drives to re-open the process for public comment before the County Commissioners. As is the case with some projects, the opposition group is also instigating a recall drive against Lake County Commissioners and Lakeview Town Council members, showing that all land use truly is political in nature.

Meanwhile, supporters are hoping that this project will receive the necessary approvals according to current plans so construction can begin in summer or fall of 2015 for operations to commence by 2016.  Just as the opponents have utilized grassroots tactics to add to their numbers, so too much supporters. To save time and money, companies must engage communities and stakeholders throughout the entire permitting process to ensure that community members are informed and engaged every step. By identifying and mobilizing members of what is often the silent majority, public support can be built throughout Lake County for a quick and successful project approval.

Firing Up Hawaiian Biomass Facility

- by Chris D’Angelo, February 11, 2015, The Garden Island

[[{"type":"media","view_mode":"media_large","fid":"401","attributes":{"alt":"","class":"media-image","style":"width: 333px; height: 250px; margin: 3px 10px; float: left;"}}]]Green Energy Team, LLC’s $90 million biomass-to-energy facility in Koloa is now hot.

“They lit the boiler and have started making steam,” said Kauai Island Utility Cooperative spokesman Jim Kelly, who is handling press inquiries for GET. “For the next probably three to four weeks, they’re going to basically be pumping steam through it and cleaning out the tubes.”

The company began testing the facility for the first time last week and expects to have it connected to the KIUC grid and producing electricity by April, according to Kelly.

The 6.7-megawatt facility is located near Knudsen Gap and will provide about 11 percent of the island’s electricity — enough to power 8,500 households and replace about 3.7 million gallons of imported oil annually. It is the first closed-loop, biomass-to-energy plant in the United States, and will rely completely on its own sources of Kauai biomass wood chips.

U.S. Added 254 Megawatts of Biomass Energy in 2014

- by Erin Voegele, February 6, 2015 Biomass Magazine

[[{"type":"media","view_mode":"media_large","fid":"343","attributes":{"alt":"","class":"media-image","style":"width: 198px; height: 198px; margin: 3px 10px; float: left;"}}]]The Federal Energy Regulatory Commission’s Office of Energy Projects has released the December edition of its Energy Infrastructure Update, reporting the U.S. added 254 MW of biomass energy capacity last year.

In December, the U.S. added five biomass generating units with a combined capacity of 23 MW. During the full year 2014, the U.S. added 58 biomass generating units with a combined capacity of 254 MW. In 2013, 142 biomass units were added with a combined 858 MW of capacity.

Within its report, the FERC highlighted LES Service LLC’s 6 MW landfill gas-to-energy, which came online in December. The project, known as the Zimmerman Energy Facility, is located in Fulton County, Indiana. Power generated at the facility is sold to Northern Indiana Public Service Co. under a long-term contract.

Exploiting Private Forests for Bioenergy

- by Roy Keene

[[{"type":"media","view_mode":"media_large","fid":"100","attributes":{"alt":"","class":"media-image","height":"319","style":"width: 333px; height: 221px; margin: 3px 10px; float: left;","width":"480"}}]]The debate over a single wood powered electrical generator in Eugene has been myopically focused on just one project and one proposed fuel source. Supporters for Seneca Sawmill Co.’s proposed power plant have yet to publicly mention that slash could be replaced with chipped trees as fuel prices rise, or that this plant could be the first of many as wood-generated electricity becomes more profitable.

According to the U.S. Department of Agriculture, “The Eugene-Springfield area is one of the largest wood products processing areas in the world.” This area is also the epicenter for a huge volume of industrially owned forest biomass. With industry’s infrastructure in place and hundreds of thousands of acres in tree plantations, our area is ideally positioned for wood-fueled electrical power generating. Once Seneca has perfected their generating process and shown profits by selling electricity back to the grid, similar proposals and projects can be expected — especially as more federal “green” energy subsidies become available.

What a 20-year Biomass Battle Tells Us About Environmental Justice Policy

- by Brentin Mock, February 24, 2015, Grist

[[{"type":"media","view_mode":"media_large","fid":"398","attributes":{"alt":"","class":"media-image","height":"270","style":"width: 333px; height: 187px; margin: 3px 10px; float: left;","width":"480"}}]]It’s well-established that the Environmental Protection Agency has been quite flaccid when it comes to enforcing civil rights issues. The online news outlet E&E recently took the time to remind us how bad it is last week, reporting from Flint, Mich., where environmental justice complaints about a biomass energy plant built in a low-income, black community have gone ignored since the early 1990s.

“In that corner of Flint, there is just a lot of polluting stuff that’s either in Genesee Township or the northeast side of Flint, and nothing has ever really been done about that,” Rev. Phil Schmitter told E&E reporter Robin Bravender. “The plant is about a mile from an elementary school and a low-income housing complex.”

Back in 1994, environmental justice activists in Flint asked the EPA to block construction of the biomass plant, arguing that low-income African Americans have already suffered enough from the concentration of pollution and poverty in the northeastern quarter. The EPA noted the request, and it’s on the agency’s list of civil rights complaints, filed July 1, 1994 as one of the few cases accepted for investigation. But here we are, over 20 years later, and the situation hasn’t been resolved. The plant has been up and running since 1995, burning wood to energy to its merry delight.

Now, the EPA’s lack of action on civil rights enforcement deserves scrutiny, even as the agency has taken steps like creating Plan EJ 2014, a detailed proposal for correcting this problem. And certainly there are cumulative impact questions that need to be answered in Flint. But as much as anything, the story of the Flint biomass plant reveals just how complicated these issues can be.

Green Crony Capitalism: Oregon’s Governor and the Grifter(s)

- by Michael Donnelly, February 13, 2015, Salem News

[[{"type":"media","view_mode":"media_large","fid":"394","attributes":{"alt":"","class":"media-image","height":"300","style":"color: rgb(73, 73, 73); font-family: Verdana, sans-serif; font-size: 12px; line-height: 20.671998977661133px; width: 200px; height: 300px; margin: 3px 10px; float: left;","title":"Tillamookcountypioneer.net","width":"200"}}]]Oregon’s Governor-for-Life John Kitzhaber, 68, resigned Friday the 13th. His resignation letter was the usual lawyerly-parsed, blame-the-media/take no responsibility sham we’re used to seeing. 

He had been governor from 1995-2003 and again from 2011 until now. 

The basic allegations which forced the rest of the state’s Democratic Party elite – Senate President, House Speaker, State Treasurer and others to join the state’s largest newspaper and call for his resignation - involve influence-peddling by his ten-year girlfriend/fiancée Cylvia Hayes. 

Hayes, 48, - a woman with a grifter’s history - pretty much publicly advertised that her clout with the governor was for sale and cashed in for over $200,000 at the same time she was his advisor on energy policy, working out of the governor’s mansion and using government employees as subordinates. 

The most damning allegation? She took over $118,000 from a sham non-profit that went defunct without ever filing a report with the IRS. She herself never reported her payments. The entire purpose was to shake loose tens of millions of state subsidies for “Green” Energy projects. 

The Energy Foundation - Banksters for the “Green” “Movement.”

 

It’s all because of something called the 25 by 25 Renewable Energy Portfolio standards that were quietly adopted in Oregon (and many other states). It requires that 25% of the energy mix in Oregon’s grid to come from Renewable sources by 2025. 

 

A shadowy non-profit called The Apollo Alliance went state to state pushing the concept. Suddenly, there was a huge pool of tax money to be tapped by private entities with ties to renewable energy. Mission Accomplished!

 

In 2013, Cylvia Hayes was hired by the Energy Foundation. This San Francisco group, tied to billionaire Democrat sugar daddy and potential California US Senate candidate Tom Steyer, paid her $40,000 dollars and funded part of her fellowship with Clean Economy Development Center (CEDC), a clean energy group based in Washington, D.C, though Hayes seems to have been their only paid fellow. Another top green paymaster, the Rockefeller Bros. Fund also contributed. 

 

Jessica Bailey, of 1sky/350.org and a former program officer for sustainable development at the Rockefeller Bros. Fund also was a strategic adviser to CEDC. Hayes’ fellowship salary was the $118,000 she did not report. The CEDC was stripped of its tax status in 2014 for failing to file IRS returns for three consecutive years. 

 

The most damning thing for Kitzhaber is that he then hired the guy, Dan Carol who arranged for Hayes’ Fellowship as his own highest-paid aide - at a $162,720 annual salary; nearly twic Kitzhaber’s own $98,600 salary. Somehow, they thought no one would notice!

 

The “Green” Biomassacre

 

Number of years the United States could meet its energy needs by burning all its trees: 1 - Harpers List, January 2006

 

The Apollo Alliance and allies have also been traveling around pushing Biomass projects, greenwashing the forest habitat, species and huge carbon cost of burning trees (let alone trash which they also consider “renewable”) - a process 1.5 times dirtier than burning coal - for small amounts of electrons. 

 

There’s a reason for it. After all the tens of millions in wind farm subsidies and other renewables, they make up about 4.7% of the power in Oregon’s grid – power that is useless on its own without coal-powered, steam-generated baseload energy regulating the grid from the Boardman Coal Plant, Oregon’s largest carbon polluter.

 

That 4.7% barely keeps up with the increases in consumption. And, now the Boardman Plant is being forced to go off coal and --- you guessed it --- switch over to Biomass. Burning our forests is the only way they can possibly meet the 25% target (Though some are trying to get Nukes declared renewables for portfolio purposes!)

 

Since the Democrats cannot call for the necessary reduced energy consumption in our grow-or-die economy (they’ve proven that time and again in their regular endorsements of oil wars), they have fully embraced forest liquidation for Biomass. 

 

Green groups funded by the same cabal of foundations (who collectively operate as the Environmental Grantmakers Association – EGA) have also come on board plans to strip forests for Biomass under the guise of fire-proofing them. 

 

That part of the equation has corrupted elected officials at the federal level with Democrats Sen. Ron Wyden and Rep. Peter DeFazio echoing John Kitzhaber and the two other Democrats on the State Land Board in calling for massive increases in logging on public forests – state and federal - and successful plans to sell off parts of our state forests.

 

The quietly adopted 25 by 25 Renewable Energy Portfolio corrupted Oregon Democrats...as a whole, not just Kitzhaber. It’s also one of those tip of the iceberg things. 

 

Green Crony Capitalism is also a national phenomenon, not just Oregon. And it’s been exposed here and hit here in Oregon hard because it's partly a one-party state thing, the fact that the Oregon GOP is certifiable is a sad part of the equation. Flat Earthers would be a kind way of describing them. 

 

The fact that a lot of this was known before the election and Oregonians still voted for Kitzhaber is telling. His opponent was atrocious. There are no more Tom McCalls, Vic Atiyehs or even Bob Packwoods in the Oregon GOP. They’d be drummed out in a second these days.